Project: Industrial Warehouse, Warrington
Value: £1,500,000
Duration: 6 months
Scope of works: Promat mezzanine fire protection, Cryotherm columns fire protection, Intumescent spray to columns and beams, firefly vertical fire protection, fire stopping, Drylining suspended ceilings glazed screens and joinery

We were delighted to be asked to carry out the following works for Stapleton Tyres on behalf of ISS. The works to the warehouse consisted of fire protection to mezzanine floors, fire protection to the perimeter of the building, and steel columns and beams. The works to the office complex consisted of new glazed screens, metal stud partitions, suspended ceiling, and all aspects of joinery.

The entire project was one of our biggest and most successful, with the project handing over within budget on time and to the highest standard

Peelers Yard

Client: Cert Properties 
Project: Peelers Yard
Value: £1,800,000
Duration: 9 months
Scope of works: Scope of works: British Gypsum drylining and ceilings, British Gypsum fire stopping, Sherwin Williams intumescent paint Promat beam encasements, Metsec SFS, Terrix Spray plaster.

This exciting project involves the delivery of an 81-bed apartment block spanning 8 floors, contributing to the continued growth and regeneration of the city’s residential landscape.

Our team where responsible for delivering key elements that ensure both quality internal finishes and critical fire protection throughout the building.

Kirkstall Place

Client: Artisan
Project: Kirkstall Place, Leeds
Value: £2,400,000
Duration: 18 months
Scope of works:

Scope of works: Knauf drylining and ceilings, British Gypsum fire stopping, Knauf spray plaster.

This project features 263 low-carbon, low-energy homes featuring the latest technology to promote sustainability, increase wellbeing, and drive down the cost of living for future residents.

UCLAN Dentistry

Client: Equans
Project: UCLAN Dentistry
Value: £150k
Scope of works: Complete SFS walls and Roof, weather defence board and insulation, Internal Fermacell partitions, Ecophon suspended ceilings, Gyptone ceilings, painting and Fire protection

The Archway team worked alongside Equans to develop the scheme in pre-construction to ensure costs and design were robust and met the client’s requirements.

Once on site, we were responsible for the construction of the SFS walls and roof to create the extension; we then built internal Fermacell walls, Ecophon ceilings, and fire protection for the steel beams through the penetrations, temporary screens, and painting.

This excellent project was completed on schedule and within budget.

Loreto College

Client: Caddick Construction
Project: Loreto College
Project value: £170,000
Scope of works: Fire Stopping, acoustic seals and air seals.

Archway Fire Protection were engaged by our client Caddick Construction early in the project to help provide passive fire solutions throughout this prestigious project.

In one of our most successful projects to date we have worked tirelessly together with Caddicks to ensure a fire safe environment for all.

Archway
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.